Copyright © Foshan Mingyi Energy Saving Technology Co., Ltd. All Rights Reserved. Site Map
1. Design a plan and quote based on the customer's requirements.
2. After both parties determine the plan, sign a contract and pay a deposit.
3. Product delivery time ranges from 35 to 90 days. (Except for force majeure)